Steel and concrete bridge on the R1 speedway Beladice – Tekovské Nemce, Slovakia

Installation of steel structure of a 5-span reinforced concrete bridge with a total length of 186 m and the individual spans of 33 + 3×40 + 33 m. The supporting structure consists of a continuous steel-concrete grid made of full-wall welded I-beams of different height from 1 485 to 1 540 mm. The steel structure is laid out in a directional arc with a radius of R = 2.550 m, which follows the R1 route as faithfully as possible. During construction, some specific problems were solved, for example, temporary placing of the structure on the supports to eliminate its sinking or ensuring the quality of assembly welds in adverse climatic conditions by using the so-called welding cabin.

neprelozene Rok realizácie
2010
neprelozene Investor
Národná diaľničná spoločnosť, a.s.
neprelozene Objednávateľ
Eurovia CS, a. s.
neprelozene Hmotnosť konštrukcie
1050 t
PROJECTS

neprelozene PREMENÍME VAŠE SNY NA REALITU

Sanen Luxembourg
Kronospan CHP3 regeneration boiler plant,
Ivachnová, Slovakia
Construction of Ivachnová mall
Kemi, Finland
Regeneration boiler plant
Frovi, Sweden
Regeneration boiler plant BillerudKorsnäs,
Fjernvarme, Denmark
Biomass boiler plant
Bratislava, Slovakia
New construction and partial rehabilitation of the H1 Volkswagen welding plant in
Tampere, Finland
Biomass boiler plant Naistenlahti 3
Husum, Sweden
Boiler plant of Metsä Board recovery boiler
Kazincbarcika, Hungary
Pipe bridges, production and operational facilities Borsodchem
Uppsala, Sweden
Biomass boiler plant Vattenfall