In 2011 and 2012, Promont, s.r.o. supplied steel structures for the "Shipping hall and zinc workshop". Production, transport and assembly of hot-dip galvanized columns and roof beams of the steel structure of the galvanizing plant (60 x 36 m, height 14.7 m) and secondary roof and facade steel structures of the prefabricated reinforced concrete shipping hall (96 x 84 m, height 9.5 m). Part of the work supplied was also the manufacturing and assembly documentation.
In 2017, while extending its own plant, Promont, s.r.o. supplied steel structures for the "New construction of the production-warehouse hall". Production, transport and assembly of hot-dip galvanized columns and beams of the roof of the steel structure of the zinc plant (100 x 44m, height 17.8m) and secondary roof and facade steel structures of the prefabricated reinforced concrete shipping hall (57 x 48 m, 12.3-m high). Part of the work supplied was also the manufacturing and assembly documentation.
In 2020, we manufactured, transported and assembled hot-dip galvanized columns and roof beams of the steel structure for the extension (13 x 48.5 m, 9.5-m high) and secondary roof and facade steel structures. Part of the work supplied was also the manufacturing and assembly documentation.